Re: Light at the end of the tunnel Was Re: 5291 - A Task Force

From: Hubert Figuiere (hfiguiere@teaser.fr)
Date: Fri Sep 26 2003 - 17:37:33 EDT

  • Next message: msevior@physics.unimelb.edu.au: "Re: Light at the end of the tunnel Was Re: 5291 - A Task Force"

    According to Johnny Lee <typo_pl@hotmail.com>:
    > I took a look at this problem and have come up with a rough solution.
    >
    > The changes need some cleanup though.
    >
    > My changes reduce the import time (measured from when I click Open on the
    > Open File dialog box until 'Importing Document...' disappears from the
    > status bar) from ~120 seconds to ~22 seconds.
    >
    > The document spends at keast another 40 seconds building the document
    > though.

    I haven't tested, but GREAT JOB. I still have a slow machine, so I
    volunteer for guinea pigging.

    Thanks a lot for taking some time.

    Hub

    -- 
    AbiWord maintainer - Lille, France
    http://www.figuiere.net/hub/ 
    GPG fingerprint: 6C44 DB3E 0BF3 EAF5 B433  239A 5FEE 05E6 A56E 15A3
    


    This archive was generated by hypermail 2.1.4 : Fri Sep 26 2003 - 17:52:57 EDT